Yamaha Wolverine Forum banner

UORP 2021 RMAX/X2/X4 Gullwing/framed upper doors

1 reading
92K views 320 replies 53 participants last post by  WNC1000  
I emailed them last week asking about doors for the X2, they have no idea when they might be available but hopefully soon. Nothing on their website about availability for any of the machines.
 
It would be great if easily removed. It would also be great to have a screen and plastic option.
Read the whole thread, the doors are easily removable if needed.
 
Will the doors for the RMAX2 fit an X2 since the doors are the same (not sure about the cage)?
 
Will there be any issues with installing these doors with the Yamaha factory split windshield for a 2022 X2? I want to preorder as soon as possible.
 
When do you think we can order X2 doors. Will there be a pre order or first come like the X4?
I emailed them today, should get an answer within a day or so as they are pretty responsive but I would guess that it's going to be a while before they do anything for the X2's, right now they seemed more focused on the RAMX machines. Hopefully I'm wrong on that.
 
Now that the groundwork has been done and the fixtures\molds have all been made, the RMAX4 uppers are being produced by the main company Greg works for, Palmer Hamilton. This is allowing Greg to work on the RMAX2 doors NOW. Pre orders are going to be the norm as it eliminates any missed notifications and gives UORP a good idea of demand and those who are serious vs window shoppers.
I know the factory doors and roll cage are the same part numbers for the RMAX2 and the X2 850 so these upper doors should fit both machines correct?
 
Back to the trimming of the doors so they will fit using the Yamaha folding windshield, what kind of trimming is required to make them fit? Watched the video, seems like a fairly easy install and will be good to reference when installing the doors (once the 2 door version is made).
 
  • Like
Reactions: DialTone301
Are these doors going to be a regular product now or is this going to be a limited run?
 
I'm going to guess that they'll be done in batches as time permits. It doesn't make sense to do all that work, make templates, molds, etc. and just up and stop producing them. The problem is that as previously-mentioned, UORP is a side business done for fun. Greg's not making much profit on these. Timing has not been on his side either whether it be the main business needing to be put on the forefront or natural disaster.
Gotcha, I was asking because I really want a set of these doors but I want to wait a little bit before I buy them. I know the first run will set quick and that's another reason why I am waiting. I'm also going to assume that the price you listed which includes shipping doesn't include Alaska, I imagine it's going to be higher to ship here.
 
Question, when pre-ordering the doors do they charge you as soon as you order or when they ship them?