Yamaha Wolverine Forum banner

UORP 2021 RMAX/X2/X4 Gullwing/framed upper doors

92K views 320 replies 53 participants last post by  WNC1000  
Ode to the UORP timeline...

How do you think I'm going to get along
Without windows this winter?
You teased me with everything you had
And left me out on my own
Are you happy, are you satisfied?
How long can I stand the cold?
Out in the strip mines the frigid winds rip
Man this is getting old, look out

Another month bites the dust
Another month bites the dust
And another month gone, and another month gone
Another Month bites the dust
Hey, I'm gonna get you too
Another month bites the dust:p

Apologies if that song is stuck in your hea now, lol
 
It looks like I missed the pre order. I recall a bunch of drama when the 4 door ordering started as well. I wonder what the best way to get a set for a 2 door will be? I don't have time to watch the internet like I'm bidding on a ebay deal. Would be nice to just place an oder and have it show up in 3-4 weeks.